These terms apply to all quotations, order confirmations and sales of goods by Taizhou Worui Warehousing and Logistics Equipment Co., Ltd. ("the Seller") unless varied in writing and signed by both parties.
Quotations are valid for 30 days unless stated otherwise. Prices are exclusive of taxes, duties and any charges not expressly listed.
An order is accepted only when the Seller issues a written Order Confirmation. The Buyer is responsible for the accuracy of the specifications, voltages, plug types and documentation requirements stated in the order.
| Method | Terms |
|---|---|
| T/T (bank transfer) | 30% deposit with the order, 70% balance before shipment |
| L/C at sight | Irrevocable, confirmed, at the Seller's bank |
| Other | By written agreement |
Bank charges outside China are for the Buyer's account.
Delivery terms are as stated in the Order Confirmation (normally FOB Shanghai or Ningbo). Risk passes to the Buyer in accordance with the agreed Incoterms 2020 rule. Lead time runs from receipt of the deposit and confirmation of all technical details.
The Buyer must inspect the goods on arrival. Any claim for shortage or visible damage must be notified in writing within 14 days of arrival, with photographs. Claims for hidden defects must be notified within the warranty period.
The Seller warrants the goods against manufacturing defects for 12 months from the date of shipment. Wear parts (wheels, brushes, seals, hydraulic oil, fuses) and damage caused by overload, accident, misuse, unauthorised modification or failure to follow the maintenance schedule are excluded. The Seller's obligation is limited to supplying replacement parts free of charge. Labour and travel are not included unless agreed in writing.
The Seller's total liability for any claim is limited to the value of the goods giving rise to the claim. The Seller is not liable for loss of profit, loss of production or any indirect or consequential loss.
All drawings, specifications and technical documents supplied by the Seller remain the Seller's property and may not be disclosed to third parties without written consent.
Neither party is liable for delay caused by events beyond its reasonable control, including natural disaster, war, epidemic, government action, port congestion or failure of suppliers.
These terms are governed by the laws of the People's Republic of China. Disputes shall first be resolved by negotiation; failing that, by arbitration in Shanghai.