โ— ISO 9001 Certified Manufacturer Special Equipment Production Licence OEM / ODM Welcome
Factory

Factory & Quality

From raw material to loaded container - every step recorded

Production

From raw material to finished components

Raw Material Raw Material - WR Forklift

Raw Material

Steel plate and profiles received and inspected for source and batch.

Laser Cutting Laser Cutting - WR Forklift

Laser Cutting

Large-format laser cutter, sheets cut automatically by program.

Welding Welding - WR Forklift

Welding

Frames and masts welded to procedure, key welds inspected.

Shot Blasting Shot Blasting - WR Forklift

Shot Blasting

Welds ground and blasted to remove rust and scale.

Machining

Cutting, forming and precision machining

Wire EDM Cutting Wire EDM Cutting - WR Forklift

Wire EDM Cutting

Wire EDM for precise profiles and hard-to-machine shapes.

Jib Crane Handling Jib Crane Handling - WR Forklift

Jib Crane Handling

Jib crane moves heavy components between workstations.

Curing Oven Curing Oven - WR Forklift

Curing Oven

Powder coating cured at high temperature to form the coating.

Tube Bending Tube Bending - WR Forklift

Tube Bending

Tube bender forms hydraulic and structural tube runs.

Assembly

Frame and mast assembled piece by piece

Cutting Cutting - WR Forklift

Cutting

Metal band saw cuts tube and profile to length.

Forming Forming - WR Forklift

Forming

Press brake forms the frame structure.

Machining Machining - WR Forklift

Machining

CNC lathe finishes precision components.

Precision Turning Precision Turning - WR Forklift

Precision Turning

Turning operations held to drawing tolerance.

Testing & Delivery

Every truck tested before it ships

Mast Assembly Mast Assembly - WR Forklift

Mast Assembly

Mast and frame assembled piece by piece.

Frame Assembly Frame Assembly - WR Forklift

Frame Assembly

Chassis and drive axle fitted first, then the mast erected.

Component Fitting Component Fitting - WR Forklift

Component Fitting

Cylinders, chains and pulleys fitted to specified torque.

Final Assembly Final Assembly - WR Forklift

Final Assembly

Assembly sequence followed step by step; key bolts marked.

Want to see it in person?

We are in Gaogang District, Taizhou, Jiangsu - about two hours from Shanghai. Arrange a visit and we will show you the plant and run a machine for you.

Arrange a Visit See Certifications